.75 And 1 Ton Full-Size Trucks - 8 Lug Diesel Truck Magazine
Google + Facebook
Gallery
INSTALLING PPE GAUGES AND A TRIPLE-GAUGE A-PILLAR POD
 
< previous photo 
Photo 24 of 30
next photo >
Ppe A Pillar Gauge Package Lighting Leads
The light lead was piggybacked off of a lead wire using the supplied electrical connectors. They simply fold over the wanted wire and are crimped in place. A male connector was then plugged into it and run to the gauges. The lighting leads from the gauges are ganged together so that only one lead is run to the dimmer switch. The same process is used for the power and ground leads. They are ganged and then led to a point under the dash and then installed. A post holding the dash to the metal frame was used for the ground.
Ppe A Pillar Gauge Package Connect Gauges To Fuse Block Ppe A Pillar Gauge Package Pull Side Panel Ppe A Pillar Gauge Package Make Connections Ppe A Pillar Gauge Package Wires Are Color Coded Ppe A Pillar Gauge Package Install A Pillar Pod Ppe A Pillar Gauge Package Completed A Pillar Gauges
0 comments
Trade In Value